Week of December 31, 2006 - WE PASSED
The inspector has passed our general constructing, plumbing, heating and electrical. We are now in the process of insulating the house.

Interesting how they install plumbing these days. The red and blue tubes are flexible with the red being for hot water and the blue for cold.


The insulation was installed by stapling plastic across the 2x4's and then holes were torn in the plastic and a dense cotton like material was blown in through the holes.



We will be out of town for 2 weeks and will be back to work as soon as we return.